KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  6-11-2015
Number of Hours:  1.50
Manual Reference:  49-19
Brief Description:  Installed shroud hose, repositioned oil cooler

Cut an 11 inch piece of 2.5 inch SCAT hose to make the FF-1207B Shroud Hose. It would not fit well over the left air inlet of the Bottom Cowl. Had to sand the inlet to make the hose fit. Installed the Bottom Cowl to the fuselage and the Oil Cooler is still not falling easily into position on the cowl guides. Had to cut the zip tie holding the VA-213 and VA-215 hoses and pulled the Oil Cooler forward. Very little slack available. Also adjusted the VA-214 hose to move the cooler to the left.

Inventoried the parts for SB 14-11-03, RV-12 Wing Skin/Spar Flange Rivet Wear. Separated the different rivets, labeled and placed in bags.
' style=

Shroud hose

Shroud hose

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.