KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  4-19-2015
Number of Hours:  4.00
Manual Reference:  49-13
Brief Description:  Work on the Cooling Duct and Cowl Interface

Placed the Cooling Duct and Cowl Duct Interface on the Cowl Bottom, and installed on the fuselage. Trimmed the aft part of the cooling duct some more and the outboard flange of the duct interface. Had to do fitting, marking and sanding several times before getting the 1/4 inch clearance between the interface the FF-1209 Seal Face. Drilled #40 holes in the interface and into the cooling duct.
' style=

Duct interface and radiator

Duct interface and radiator

' style=

Interface clecoed to duct

Interface clecoed to duct

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.