KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  11-16-2014
Number of Hours:  3.00
Manual Reference:  38-09
Brief Description:  Work on Bottom Cowl Close-Out

Attached the F-1285 Cowl Bottom Close-Out to the F-1285B-1 Cowl Close-Out Bracket and clamped it to the Bottom Cowl. Match-drilled #19 holes through the Close-Out and into the Bottom Cowl. Dimpled the rivet attach holes and the nutplate holes. Riveted K1000-08 nutplates to the close-out. Drilled #30 holes throught the nutplates on the F-12118 Cowl Attach Plates and into the Bottom Cowl. Final-drilled #19 the two holes. Sanded the edges of the slot in the Bottom Cowl where the nosegear leg is located. Also did minor sanding of the left side edge of the Top Cowl. Deburred other parts and hardware in preparation for priming.
' style=

Dimpled Close-Out

Dimpled Close-Out

' style=

Holes in cowl for Close-Out

Holes in cowl for Close-Out

' style=

Nutplates riveted to Close-Out

Nutplates riveted to Close-Out

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.