KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  10-11-2014
Number of Hours:  5.00
Manual Reference:  47-03 to -05
Brief Description:  Positioned spinner and drilled holes into plates

Removed the propeller, spinner, hub, spinner plate and front spinner bulkhead. Deburred the holes in the spinner plate and front spinner bulkhead. Re-installed the prop and set at “high pitch” and torqued the bolts to 19 ft-lbs. Clamped the spinner to the spinner plate and adjusted the spinner until there was no significant movement (>1/16 inch) from the edge of a ruler positioned approximately center of the pitot tube hole.

Match-drilled 4 holes into the spinner and S-1203 Front Spinner Bulkhead. Used a #40 drill bit first and final-drilled to #30. Drilled holes through the spinner and the S-1202 Spinner Plate, initially #40 and then #30, and then clecoed the spinner to the Plate. Trimmed and sanded the spinner overhang aft of the spinner plate.
' style=

Torquing bolts holding prop

Torquing bolts holding prop

' style=

Setting final spinner position

Setting final spinner position

' style=

Holes drilled into spinner

Holes drilled into spinner

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.