KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  9-17-2016
Number of Hours:  4.00
Manual Reference:  PAP, 35, SB
Brief Description:  Systems check, installed Wing Walk

SB-12-11-09, 35-03, PAP G1-2: Re-checked the torque of the bolts attaching the Main Gear Leg to the fuselage. The torque was OK on most of the bolts except for 2 on the right side. Tightened the 2 bolts with the proper torque and applied fresh torque seal on all of the bolts.

35-05: Removed the vinyl cover from the inboard top of the wings, cleaned the surface with acetone and installed the F-1219C Wing Walks.

Made grounding cables to be used when fueling the aircraft using alligator clamps from HF and 1/16 steel cable from Lowe's. Did clean up and organized parts and tools in the hangar. The Tech Counselor is coming tomorrow to inspect the plane.
' style=

Main Gear bolts

Main Gear bolts

' style=

Main Gear bolts

Main Gear bolts

' style=

Wing Walk installed

Wing Walk installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.