KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  8-14-2016
Number of Hours:  3.00
Manual Reference:  21-18, 34-02
Brief Description:  Replaced Canopy Gas Struts, Installed Steps

21-18: Installed the Steps and torqued the bolts to 60 in.lbs.

34-02: Got the new Canopy Gas Struts with steel eyelets. Enlarged the holes per the plans using a drill press. Shortened the AN509-10R16 screws so they don't hit the Canopy Fairing. Replaced the old struts with the new ones which are supposed to hold the Canopy better with sudden opening of the Canopy especially when there is a wind gust.
' style=

Steps installed

Steps installed

' style=

New Gas Struts

New Gas Struts

' style=

Strut installed

Strut installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.