KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  6-26-2016
Number of Hours:  2.50
Manual Reference:  51A, PAP, 42G, 34
Brief Description:  Worked on COM radio, installed placard

51A-03: Placed the “EXPERIMENTAL” placard on the Baggage Bulkhead Corrugation.

PAP G1-1, 42G-04, 42D-30: Turned the radio ON and it’s having the audio problem again. I adjusted the potentiometers (AUX1, AUX2, EFIS1, EFIS2 and COM) in the Control Module and did the setup in the GTR 200 again. The audio volume for COM in the headset sounded OK but the stall warning volume was weak. Disconnected the COM radio and the harnesses to the Control Module, sprayed the terminals with DeOxit and reconnected them. Will leave them as is for now.

34-15: Sanded the Canopy Fairing some more to smooth out the surface in preparation for sealing with epoxy.
' style=

Placard on baggage bulkhead

Placard on baggage bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.