KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-1-2016
Number of Hours:  2.00
Manual Reference:  34-16
Brief Description:  Work on Canopy Fairing

Sanded the part of the Canopy Fairing that is abutting the Canopy with 100 and 150 grit sand paper. Sanded other areas on the fairing that needed to be filled with resin using 60 grit paper. Filled the gaps and low areas with resin and microballoon mixture. I ran out of resin and hardener and will need to get more.
' style=

Fairing with microballoons

Fairing with microballoons

' style=

Fairing with microballoons

Fairing with microballoons

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.