KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-2-2016
Number of Hours:  1.50
Manual Reference:  34-16
Brief Description:  Work on Canopy Fairing

Sanded the dry microballoon and resin layup I placed yesterday. I still need to fill many low areas and holes which I'll do once I get the resin and hardener I ordered. Redrilled the holes in the fairing. Drilled only 2 holes on each side and will drill the 3rd holes later.
' style=

Drilled holes in fairing

Drilled holes in fairing

' style=

Template for trimming fairing

Template for trimming fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.