Brief Description: Installed Canopy Seals and Koger Shade
38-14: Installed the C-1220 Roll Bar Seal between the Canopy and Seal Retainers.
34-17 and -21: Fabricated the F-00059A Base Seals from foam blocks and installed on the Fuselage. Applied clear RTV at the locations prescribed in the plans.
34-23: Fabricated C-1222 Foam Plugs and inserted in the square tubes of the Canopy Frame.
Koger Shade: Attached the Center Channel on the canopy midline. Bent the aluminum bows to conform to the curvature of the Canopy. Placed the shade fabirc on the bows and glued. Installed the bow and fabric assembly on the Center Channel.