KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  12-5-2015
Number of Hours:  3.00
Manual Reference:  51A-02, 34-17 &-18
Brief Description:  Installed Placards on Panels, riveted extensions

37-07: Replaced the AN4 bolt I placed to temporarily secure the fuel tank to the F-1207J Attach Angle with a new one and torqued to 60 in-lbs. Painted the lower part of the fuel neck that was left unpainted before.

51A-02: Applied placards on the Instrument Panels.

34-17 and -18: Primed and painted the C-1221 Seal Retainers. Painted the C-1218 Extensions and the part of the Canopy Bow on the right side where the paint had peeled off. Riveted the extensions to the Canopy Frame after the paint was dry.

Koger Shade: Removed the plastic protective film from the inside of the Canopy in preparation for installing the Koger Shade. Bent the aluminum Center Channel to form to the curvature of the Canopy.
' style=

Placards installed

Placards installed

' style=

Painted Seal Retainers

Painted Seal Retainers

' style=

Extension riveted to Cpy Frame

Extension riveted to Cpy Frame

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.