KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  11-29-2015
Number of Hours:  4.50
Manual Reference:  26-04, 34-11 & -17
Brief Description:  Installed Latch Plate and Microswitch on Roll Bar

26-04: Installed the Seat Back Assemblies on the Fuselage.

37-09: Removed the electrical tape around the flange of the Fuel Neck which I placed to avoid smearing tank sealant on the right Fwd Turtle Deck Skin. Removed the excess sealant faround the fuel neck and the opening. Installed the fuel tank cap. Repositioned the T-1204B Flange and tightened the hose clamps.

26-04: Riveted the F-1231F-1 Latch Plate to the Roll Bar.

34-11: Installed the ES E22-50K Microswitch on the Roll Bar Assembly and connected the wires to the ground and N.O. terminals.

34-17: Fabricated the C-1218 Extensions. Drilled #30 holes in the extensions and match-drilled holes in the Canopy Frame. Primed the extensions. Deburred the C-1221 Seal Retainers and beveled the edges of the slots per the plans.
' style=

Seat back assemblies installed

Seat back assemblies installed

' style=

Latch plate and switch installed

Latch plate and switch installed

' style=

C-1218 Extensions

C-1218 Extensions

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.