KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  10-10-2015
Number of Hours:  3.00
Manual Reference:  32-14, 28-06
Brief Description:  Work on Stabilator cables

28-06: Loosened the clamps holding the F-1259F Fuel Line Tank and F-1259H Fuel Return Line Aft so I could position them lower (especially the F-1259H) because they appear close to one of the stabilator cables. Re-applied the clamps after bending the F-1259H.

32-14: Tightened the turnbuckles until only 3 threads were showing at each end. Will install the clips after I check the tension (after I can borrow a tensiometer). Positioned the control sticks 10 inches aft of the instrument panels and placed a long clamp form the left to the right Longeron. This is in preparation for testing the cable tension.

31-03: Replace the extra strings in the F-1204Y Wire Run Conduit with thin insulated wires. The original strings are fishing lines. The wires have a more pleasing appearance and easier to tuck under the bottom of the conduit.
' style=

Stab cables with turnbuckles

Stab cables with turnbuckles

' style=

Clamp securing sticks

Clamp securing sticks

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.