43-04: Temporarily installed the F-1214 Floor Step Cover and the F-1230 Tunnel Cover and then trial installed the F-12177 Pocket Base and F-12176 Tunnel Pocket. I have the full carpeting option and I'll have to figure out how to install the pocket once the carpeting is placed.
21-15: Went back to Section 21 and riveted the upper 2 holes of the F-1275F Fuselage Cover Skins (left and right) in front of the main landing gear.
37-08: Connected the T-01219B and T-01219C Fuel Vent Lines to the "T" of the Fuel Vent Air Line Assembly. Secured the T-01219A clear plastic line to the T-01219B Vent Line with zip ties. Wrapped self-fusing silicone tape below the zip ties to prevent them from slipping downward. I did not want to over tighten the zip ties to avoid crimping the plastic tubing. Connected the plastic tubing to the SD-42-BSLF rivet in the F-1282-R Skin. Beveled the forward side of the the tip of the T-01219B Vent Line that is below the Tailcone using a small metal hack saw and filed the edges.