KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-20-2014
Number of Hours:  5.50
Manual Reference:  37-03, -06 & -07
Brief Description:  Installed Fuel Tank Vent, Gauge and nutplates

37-03: Riveted 2 K-1000-3 to the Fwd Tank Bracket and the T-0008 and T-0009 Clips.

37-07: Bolted the Fuel Tank to the Fuselage and attached the T-1211 Fuel Neck to the tank and F-1277-R Fwd Turtle Deck Skin. Match-drilled holes into the flange of the fuel neck. Temporarily installed nutplates to the flange and drilled nutplates rivet attach holes. Countersunk the holes and then riveted 6 K-1000-06 nutplates. Bent the fuel neck flange a little bit to better conform to the curve fo the right Fwd Turtle Deck Skin.

37-06: Installed the Fluid Fitting for the Fuel Tank Vent and applied a generous amount of sealant. Also installed the IE-00001 Mechanical Fuel Gauge per the plans. Had to replace a few screws tnad nuts that would not set properly.
' style=

Drilled holes in Fuel Neck Flnge

Drilled holes in Fuel Neck Flnge

' style=

Nutplates on Fuel Neck Flange

Nutplates on Fuel Neck Flange

' style=

Vent and Fuel Gauge installed

Vent and Fuel Gauge installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.