Brief Description: Canopy, Instrument Panel and Avionics work
42C-07 – Reinstalled the AV Garmin SL 40-12 Tray and connected the harness to the Control Module. Inserted the Garmin SL 40 Radio in the tray and locked it.
29-05 - Installed the F-1240 Upper Forward Fuselage Skin using AN507C832R8 screws to the top of the Fwd Fuselage. Riveted the F-1202D Panel Attach Strips to the aft edge of the Upper Fwd Fuselage Skin. Countersunk 2 holes in the sides of the Canopy Frame for #10 flush head screws.
34-02 and -03 – Bolted the Canopy Frame to the Fuselage. Enlarged the aft holes in the gas struts to accept the bushings. Will continue work tomorrow.