Fabricated the F-1289D Caliper Brake Lines and connected them to the fittings in the Inbd Main Gear Attach Brackets and the brakes. Connected the F-1289C Main Brake Line to the Inbd Main Gear Attach Brackets and secured them with zip ties per the plans. Not sure how tight the fittings should be but will tighten them later. Placed the clear plastic tubing around the brake lines and secured them to the Main Gear Legs.
35-02: Drilled a 3/8 hole through the left side of the firewall for the WD-1221 Engine Mount Standoff. This was a slow process and I used progressively larger drill bits until the final 3/8 diameter was reached.