Date:  3-9-2013
Number of Hours:  5.00
Manual Reference:  SB-12-11-09, etc
Brief Description:  Bolted main gear axles, installed nose gear

SB-12-11-09: Final-torqued the bolts securing the main landing gear legs to the Center Section Assembly and applied torque seal.

35-04: Bolted the main gear axles to the main landing gear legs and torqued to 100 in.lbs. per the Matco Manual. I couldn't find the washers to be placed between the axle nuts and the wheels (bearings). I'm not sure if I misplaced them or did not get them with the kit. I will need to order and install them before lowering the wheels to the floor.

37-07: Bolted the WD-1201 Nose Gear Assembly to the fuselage but did not final-torque the bolts.
' style=

Left gear axle installed

Left gear axle installed

' style=

Right gear axle

Right gear axle

' style=

Nose gear assembly installed

Nose gear assembly installed

' style=