My RV-12 Build Log
' style=
Date:  10-9-2011
Number of Hours:  4.00
Manual Reference:  31-04 & -05
Brief Description:  Installed Tunnel Harness

Have not worked on the airplane for awhile because I was out of town a lot the past month I also was not sure if the wiring harnesses I have would be compatible with the Dynon Skyview. I asked Van's and they said to proceed with the wiring work except for the work on the contact points. Routed the WH-RV-12-Tunnel Harness through the Left Instrument Stack Support, Panel Base and the bulkheads. Installed the ES CPU Fans. Installed ring terminals to the fan wires. Attached spade connectors to the wires that connect to the FT-60 Fuel Flow transducer. Routed the appropriate wires for the Stall Warning, Fuel Level, GPS Data Out and Spar Pin. The work was slow, having to locate and inventory the parts in some of the hardware bags.
' style=

CPU fans installed and wired

CPU fans installed and wired

' style=

Fuel Flow Sender wired

Fuel Flow Sender wired

' style=

Fuel Lvl & GPS Data Out wires

Fuel Lvl & GPS Data Out wires

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.