Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Fuselage
5-19-2011
< Previous Log Entry
Next Log Entry >
Date:
5-19-2011
Number of Hours:
2.00
Manual Reference:
28-02
Brief Description:
Worked on Fuel Valve parts
Primed the fuel valve hande, bracket and clip. Installed the Red Knob to the handle. Attached the Fuel Valve Bracket Handle to the Fuel Valve Handle. Installed fittings into the Fuel Valve. Riveted the Fuel Valve Clip to the bracket.
Primed fuel valve parts
Fuel valve w/ fittings in bracket
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.