KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  5-15-2011
Number of Hours:  4.00
Manual Reference:  27-05 & -06
Brief Description:  Made the Main and Reservoir Brake Lines

Installed the nuts and brass inserts to the aft ends of the two F-1289 Main Brake Lines and then routed them through the snap bushings and the tunnel in the middle of the fuselage. Secured the lines with a cushioned clamp attached to the right tunnel rib. Installed the nuts and brass inserts to the forward end of the lines and then attached them to the master cylinders on the left side. Again, a very slow process inserting the brass inserts with multiple soaking in boiling water. Prepared the two F-1289A Reservoir Brake Lines and installed fittings to one end. Attached the lines to the upper elbows of the master cylinders on the right side. This last step completes Section 27!
' style=

Soaking lines in boiling water

Soaking lines in boiling water

' style=

Main Brake Lines installed

Main Brake Lines installed

' style=

Reservoir Brake Lines installed

Reservoir Brake Lines installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.