KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  5-14-2011
Number of Hours:  2.00
Manual Reference:  27-04
Brief Description:  Installed the brass elbows to the master cylinders

Threaded the brass elbows into the ports of the master cylinders. Applied pipe thread sealant to the elbows before threading them. Connected the F-1289B Cross-over Brake Lines to the corresponding elbows. Final drilled to 5/16 the holes in three F-1276C System Blocks and placed them over the studs in the F-1276 Bottom Skin. Cut two pieces of plastic high pressure tubing, each 93+ inches long, to make the F-1289C Main Brake Lines. Will install the fittings tomorrow.
' style=

Elbows attached to cylinders

Elbows attached to cylinders

' style=

Cross-over brake lines installed

Cross-over brake lines installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.