I think I accomplished in two days on the second wing what it took more than 2 weeks with the first wing. The ribs were fitted on the spars, rivet up, then everything was treated with zinc chromate. I only had to glance at the manual a few times for confirmation rather than hours of study and pondering. The top skin was clecoed in place so the fuel tank brackets could be fitted, drilled, and riveted.