KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  9-3-2007
Number of Hours:  3.00
Manual Reference:  SNX-P01
Brief Description:  Turned Engine Over

It was a great day in the garage today! After re-installing the seat pan, I setup the Grand Rapids EIS with the appropriate engine settings. A spark plug from each cylinder was removed as indicated in the Jabiru manual. 100 Straight Mineral Oil was added to the engine (about 4quarts including the oil cooler). The starter was run for about 30 seconds and the oil pressure started to go up, as was expected. The Prince P-Tip propeller was installed.....after drilling up the bolt bushings to 3/8".
' style=

Me and my Big Grin!

Me and my Big Grin!

' style=

Prince P-Tip Prop Installed

Prince P-Tip Prop Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.