Brief Description: Drill second Axle Welded parts and Setting Toe-In
The second gearleg axle weldmount was drilled and the bolts installed. Both gear legs were installed into the main gear weldmount and the toe-in specified in the plans. The 7 degrees toe-in was set using the toe-in tool bought from Sonex LTD. The Correct gear length was verified as the toe-in was set.