KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  10-6-2022
Number of Hours:  2.00
Manual Reference:  10-8
Brief Description:  Match drill lefty skin and j-stiffeners (10-8)

The left side was a little easier in the fact that you get to turn the structure right side up, but a little harder to reach both sides of the structure to help hold it in place while you drilled. I had to use my lovely assistant for help a few times, especially when it came time to flip the empennage over…it gets pretty heavy with all those clecos.
' style=

Side skin clecoed in place (22-263)

Side skin clecoed in place (22-263)

' style=

All the holes drilled for both right and left sides (22-266)

All the holes drilled for both right and left sides (22-266)

' style=

Another view of empennage with all those clecos (22-267)

Another view of empennage with all those clecos (22-267)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.