KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  1-1-2022
Number of Hours:  4.00
Manual Reference:  9-2
Brief Description:  Started Elevator (9-2)

I’m still finishing up the -12 condition inspection but managed to make a little progress on the elevator…mostly deburring and prep work. The ribs took a while to clean up with all the intricate edges. For the bends in section 9-3, I ended up sanding the edge of the workbench to give it a radius and then clamped it in place. For the actual bending, I used a block of wood to push down the surface and start the bend. Once it was bent down most of the way, I hammered it with the plastic mallet to get the 90° bend. I then finished up with sharper radius on the edge of the workbench and the plastic hammer. Hopefully it will all line up in the end.
' style=

Ribs all deburred and clecoed together (22-001)

Ribs all deburred and clecoed together (22-001)

' style=

Tip ribs clecoed together (22-002)

Tip ribs clecoed together (22-002)

' style=

Close out bends added (22-003)

Close out bends added (22-003)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.