I started work on the vertical stabilizer today. I clecoed the VS-808PP spar doubler to the VS-803PP rear spar. I then clecoed the three hinge brackets VS-410PP, VS-411PP and VS-412PP to the rear spar. I next drilled the required holes for the hinges to #30 and match drilled the holes for the doubler as specified. Thats it for today.