KitLog pro

Powered By Kitlog Pro v2.0

MARK'S WEB SITE
' style=
Date:  12-13-2008
Number of Hours:  2.20
Manual Reference:  Section 6-4
Brief Description:  Vertical Stabilizer rear spar

I started work on the vertical stabilizer today. I clecoed the VS-808PP spar doubler to the VS-803PP rear spar. I then clecoed the three hinge brackets VS-410PP, VS-411PP and VS-412PP to the rear spar. I next drilled the required holes for the hinges to #30 and match drilled the holes for the doubler as specified. Thats it for today.
' style=

VS rear spar clecoed to doubler

VS rear spar clecoed to doubler

' style=

VS spars and ribs

VS spars and ribs

' style=

VS spar hinges and doubler

VS spar hinges and doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.