1.File flats in Cabin Cover for Munting Bracket. 2 Match Drill Holes for Bracket. 3 Counter Sink. 4 De-Burr Door attach bracket 5 Match Drill Attach bracket 6.Trial Fit Gas Stut 7. Sand Forward Door Pillar to provide more clearane for the door to close.