KitLog pro

Powered By Kitlog Pro v2.0

RV-10
Work Logs Found: 143
Category Work Time: 572 Hours
 Date
Hours
Work Log Summary

Details

 06-30-2015
2.00
Torque Flare lines inside Tunnel
Details
       

 05-12-2015
4.00
Install Fuel Line Elbows
Details
       

 10-21-2014
4.00
Contune filling around windows and doors
Details
       

 10-06-2014
5.00

Details
       

 09-27-2014
2.00
Filling the Windscreen Fillet
Details
       

 09-19-2014
8.00
Windscreen Install
Details
       

 08-12-2014
8.00
Instersection Attach Angles
       

 01-31-2012
6.00
Rivet the Cabin Cover to the Fuselage
Details
       

 01-30-2012
4.00
Continue riveting forward Fusealge Sub Assembly
Details

 01-29-2012
6.00
Rivet the Forward Fuselage Sub Assembly
Details
     

 01-29-2012
4.00
Match drill Cowl Hinge Pins
Details
     

 01-28-2012
6.00
Fabricate the Cowl Attach Hinges and Shims
Details

 01-20-2012
2.00
Prime inside Cabin Cover
Details

 01-19-2012
3.00
Continue Filling and Sanding Cabin Cover
Details

 01-18-2012
6.00
Overhead Console
Details

 01-17-2012
2.00
Match drill Backup Strips
Details
     

 01-17-2012
2.00
Apply filler to the Overhead Console/ Cabin
Details
       

 01-15-2012
3.00
Glue the Overhead console to the Cabin Cover
Details
     

 01-14-2012
2.00
Join Overhead Console Halves
Details

 01-13-2012
6.00
Install Nut Plates into Overhead Console
Details
     

 01-12-2012
4.00
Continue work on filling of door openings
Details
     

 01-11-2012
4.00
Fill Cabin cover to Fuselage opening gaps.
Details
     

 01-07-2012
5.00
Paint sub Panel and Fuselage F-1071 Top Skin.
Details
       

 01-05-2012
6.00
Trim the Front Windscreen
Details

 12-12-2011
4.00
Install De-Mister Fans
Details
       

 11-24-2011
5.00
Install Left Door Gas strut
Details

 11-22-2011
7.00
Continue Install of Door Lock on Left Door
Details

 11-21-2011
8.00
Assemble Left Door Lock
Details

 11-19-2011
1.50
Mark out Planearound Gear Box location.
Details
     

 11-19-2011
6.00
Fit Door Struts and Door Cabin Blocks to Right Doo
Details
     

 11-18-2011
8.00
Assemble and test Door Locking Mechanism.
Details

 11-17-2011
8.00
Install Plane Around Gearbox
Details

 11-16-2011
8.00
Continue work on Plane Around Install
Details

 11-15-2011
8.00
Continue work on install of Plane Around Door Mech
Details

 11-14-2011
4.00
Fit Temporary Door Pin Blocks
Details
     

 11-14-2011
2.00
Door Handle Installation work
Details
       

 11-13-2011
6.00
Match drill Door Handle Plates
Details

 11-13-2011
0.75
Install Static Lines to Tailcone
Details
     

 11-13-2011
0.25
Install rear Shoulder Harness Anchor Cable
Details
     

 11-12-2011
4.00
Door Handles and Handle Assembly
Details

 10-26-2011
0.25
Match drill the baggage door hinge frame
Details

 10-26-2011
2.00
Install lock and rivet inner baggage door panel,
Details
       

 10-26-2011
1.00
Install F-1081 baggage cover
Details
     

 10-26-2011
3.00
Install Baggage door frames.
Details
       

 10-23-2011
5.00
River rear seats
Details
       

 10-22-2011
3.00
Prime rear seats
Details

 10-19-2011
2.00
Continue fitting of left and right doors.
Details

 10-18-2011
4.00
Fit right Cabin door
Details
       

 10-18-2011
3.50
Fit left cabin door
Details
     

 10-17-2011
1.00
Start match drill of Left door hinges
Details
       

 10-16-2011
6.00
More trimimg of right door.
Details
     

 10-15-2011
6.00
Trim left and right doors
Details
       

 10-14-2011
4.00
Trim Left door to fit
Details
     

 10-14-2011
1.50
Expoxy Right door shells togther
Details
     

 10-13-2011
1.50
Epoxy left door shells together
Details
       

 10-12-2011
2.00
Match drill inner and outer door shells
Details
     

 10-12-2011
0.25
Match drill Gas strut doublers
Details
     

 10-12-2011
1.50
Expoxy Strut doublers to inner door shells
Details
       

 10-12-2011
1.50
Drill WD1043 centre Cabin Brace
Details
     

 10-11-2011
4.00
Match drill forward bulkhead
Details
     

 10-11-2011
4.00
Match drill F 1042 and forward Bulkhead
Details
       

 10-09-2011
4.00
Match drill Tailcone cover
Details
       

 10-09-2011
4.00
Continue fitting Cabin cover
Details
       

 10-05-2011
1.50
Trim Inner Door Shells
Details
       

 10-04-2011
2.00
Trim Outer Door Shells
Details

 10-03-2011
8.00
Continue trimming of Window Flanges
       

 10-02-2011
17.00
Sand and Trial Fit Cabin Top Cover
Details
       

 10-01-2011
8.00
Trim and sand Fuselage Top Cover
Details

 09-25-2011
6.00
Match Drill Rear Seats and Trail Assemble
Details
       

 09-22-2011
3.00
Paint Covers and Access Panels
Details
       

 09-18-2011
2.00
Rivet Right Centre and Seat Floor Pans
Details
       

 09-18-2011
2.00
Rivet F 1016-R Floor Pan
Details
     

 09-14-2011
2.00
Install Wear Plates to Bagage Bulkheads
Details
       

 09-13-2011
1.50
Paint Baggage Bulkead
Details
     

 09-11-2011
2.50
Install Nut Plates
Details
     

 09-10-2011
1.00
Rivet the left and right Baggage Floor Angles
Details
       

 09-10-2011
1.50
Rivet LH Baggage Floor
Details
     

 09-10-2011
3.00
Match Drill Baggage Bulkhead
Details
       

 09-03-2011
1.50
Install RH Baggage Floor and Tie Downs
Details
     

 08-29-2011
2.00
Rivet the Bottom Door seal Channels
Details
     

 08-29-2011
2.00
Prime Floor Panels
Details
     

 08-06-2011
2.00
Mask and Prime Mid Sub Floors
Details
       

 07-31-2011
1.00
Prime Rudder Pedal Links
     

 07-31-2011
4.00
Install Links and Guides on Rudder Cables
       

 07-30-2011
1.50
Install Rudder Cables to Tailcone
Details
     

 07-30-2011
1.00
Install Brake Reservoir
Details

 07-26-2011
1.25
Fit L and R Brake Lines
Details
     

 07-25-2011
5.00
Assemble Rudder Pedals
Details
     

 07-24-2011
2.00
Paint Rudder Pedals
Details
       

 07-23-2011
2.50
Trial Install Rudder Pedals
Details
       

 07-19-2011
1.50
Assemble Brake Master Cylinders
Details
     

 07-17-2011
3.00
Assemble Rudder Pedals
Details
       

 07-16-2011
2.50
Manufacture Comm Antenna Doublers
     

 07-11-2011
1.50
Final Install of steps
Details
       

 07-03-2011
1.00
Re-Install Brake Lines
Details
     

 07-02-2011
5.00
Complete Install of Fuel Pump
Details
     

 06-24-2011
3.00
Make up Fuel Valve Pipework
Details
       

 06-23-2011
2.00
Install Right Undercarige Mount Braket
Details

 06-23-2011
3.00
Install Left Undercarrige Mount Bracket
Details
       

 06-18-2011
3.00
Fabricate Fuell Pump Mounting Plate
Details
       

 06-15-2011
4.00
Trial Install Fuel Valve
Details
     

 06-12-2011
4.00
Make and fit Brake Lines
Details
       

 06-12-2011
2.00
Attach Park Brake Bracket
       

 06-11-2011
4.00
Rivet Forward Floor Pans
Details
       

 06-11-2011
2.00
Rivet Access Doubler to Tunnel
Details
       

 06-05-2011
3.00
Trim and Match Drill Access Panel
Details
     

 06-05-2011
2.50
Prime Foreward Fuelage Foot Wells
Details
     

 06-04-2011
2.00
Prepare for Primeing

 06-04-2011
3.00
Cut out Access Panel
Details

 05-29-2011
14.00
Join Halves
       

 05-28-2011
15.00
Join Fuselage Halves
Details
       

 04-24-2011
8.00
Cleco Tailcone to Forward Fuselage
Details
       

 03-15-2011
3.00
Assemble Elevator Bell Crank and Battery Holder
Details
       

 03-13-2011
5.00
Continue to Rivet Top Skins and Longerons
     

 03-12-2011
6.00
Continue to rivet Top Skin
Details
     

 03-07-2011
6.00
Rivet together Aft Deck
Details

 03-07-2011
3.00
Rivet Stifferners to Top Rear Skin
     

 02-27-2011
3.00
Rivet Bottom Edges of Skins to Bottom Skin

 02-26-2011
4.00
Rivet Forward bottom Skin to Bulkheads

 02-06-2011
16.00
Continue to Rivet Tailcone
Details
       

 02-05-2011
12.00
Rivet Tailcone
Details
     

 02-02-2011
14.00
Assemble and Rivet Tailcone

 01-09-2011
4.00
Paint L and R Skins

 01-08-2011
6.00
Machine Countesink Battery /Bellcrank Mount
Details

 12-31-2010
6.00
Trim R Fuselage side, Final drill Rear Bulkhead
Details

 12-31-2010
6.00
Make the F1011D and Match Drill
Details

 12-30-2010
4.00
Match drill Seat belt Anchors and Attchach Nut Pla
Details

 12-30-2010
4.00
Match Drill Aft Deck
Details
     

 12-30-2010
8.00
Cleco and match drill tailcone top skins
Details
       

 12-27-2010
2.00
Cleco Match Bellcrank Angles Match Drill

 12-27-2010
3.00
Cleco and match drill Rudder stop
Details
     

 12-27-2010
2.00
Cleco Aft deck
     

 12-26-2010
2.50
Match drill Skin to stiffeners
Details
       

 12-26-2010
3.50
Cleco L Skin and drill
Details
     

 12-20-2010
4.00
Cleco Skins and Match Drill
Details
     

 12-19-2010
4.00
Cut and Bend L and R Longerons

 12-18-2010
1.50
Match Drill -De burr F1006 A B and C Bulkheads

 12-18-2010
4.00
Make F1047 Stiffeners
Details

 12-18-2010
4.00
Make F-1010A Deburr Frames
Details

 12-17-2010
3.00
Match Drill F1011C
Details

 12-16-2010
0.50
Match Drill Fuselage Bulk Heads
Details

 12-16-2010
1.75
Make F1011E and F 1011A
Details

 12-15-2010
1.50
Make Tie Down Bar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.