KitLog pro

Powered By Kitlog Pro v2.0

RV-10
Work Logs Found: 18
Category Work Time: 42 Hours
 Date
Hours
Work Log Summary

Details

 06-29-2015
4.00
Torque and seal Elevator Push Rods
Details
       

 05-12-2015
2.00

Details
     

 10-25-2013
3.00
Install Roll Servo RH Wing
Details
       

 08-27-2013
3.00
Remove RH Aeliron Leading Edge
Details
       

 02-24-2013
3.00
Final Install Aeliron Trim
Details
       

 09-24-2011
1.50
Set Elevator Neutral Position
Details
       

 09-20-2011
0.50
Make Flap Motor Spacers
Details
     

 09-20-2011
2.50
Install Flap Torque Tubes
Details
       

 09-20-2011
1.00
Install Flap Motor
Details
     

 09-20-2011
0.50
Drill Flap Motor Acutator for Safety Wire
Details
     

 09-19-2011
2.50
Install RH Torque Tube bearing
Details
     

 09-17-2011
4.00
Align and Match Drill LH /RH Flap Torque Tubes
Details
       

 08-05-2011
3.00
Install Control Stciks and Pushrods
Details
       

 08-04-2011
2.50
Match Drill Stcks and Control Columns
Details
     

 08-04-2011
2.00
Assemble Elevator Idler Arm
Details
       

 08-04-2011
1.50
Assemble Aileron Pushrods
Details

 08-03-2011
2.50
Fabricate the F1090 Mid Elevator Pushrod
Details
       

 08-03-2011
3.00
Fabricate F-1089 Elevator Pushrod
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.