KitLog pro

Powered By Kitlog Pro v2.0

LANCE'S WEB SITE
' style=
Date:  12-29-2017
Number of Hours:  2.00
Manual Reference:  6T1-1
Brief Description:  Level and final drill horizontal stab top

After strap-down and leveling, final hole (A4) drilled out top of horizontal stab.
Also placed end ribs (6T1-1) an final drilled them (both top and bottom of stab).
Un-cleco'd and re-opened the top so I can debur and apply zinc chromate (corrosion control).
' style=

bottom of horizontal stab complete

bottom of horizontal stab complete

' style=

top of horizontal stab cleco'd

top of horizontal stab cleco'd

' style=

Top reopened after final drill hole sized for corrosion control

Top reopened after final drill hole sized for corrosion control

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.