KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  10-4-2017
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Painted the Throttles and Initial Fitting of the B

Painted the throttles a silver color and left them hang to dry.

The sheet of 0.02 aluminum was trimmed to the outside dimensions of the bottom forward area of the fuselage. The sheet was then creased in three equally spaced places starting with the center line of the fuselage. All edges were then bent up at about an 85 degree angle. A cutout was made in each corner to allow for the landing gear struts. The sheet was then placed under the fuselage behind the landing gear and curved to fit up between the gear struts. The corners were checked and marked as necessary for a correct fitting. Additional fittings was left for tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.