Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 8
9-26-2019
< Previous Log Entry
Next Log Entry >
Date:
9-26-2019
Number of Hours:
2.50
Manual Reference:
Steps 4 and 7
Brief Description:
Fitting the rear heat duct in place
Trimmed and sanded smooth the headrest glassed edges.
Trimmed and sanded the rear seat heat duct to size.
Cut a 2" long piece of 3/8" OD x .065"wall 2024T3 aluminum.
Cleaned and applied rust protection to the aluminum.
Notched the top of the heat duct 8 3/4" forward of the forwardlanding gear bulkhead and installed the 2" aluminum tube with flox.
8g resin and 3g hardner and flox were mixed. Workshop environment was 68% humidity and 22 deg C today.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.