Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
10-10-2015
< Previous Log Entry
Next Log Entry >
Date:
10-10-2015
Number of Hours:
1.00
Manual Reference:
Brief Description:
Flox lower longeron to right side of fuselage
Heat in the shop was at 24deg C and humidity 48%.
46g resin and 17.8g hardner were mixed together with flox.
Flox was applied to the fiberglass on the right fuselage side where the lower longeron is to go.
The longeron was positioned back in place using the nails and nail holes from the previous step.
The wooden blocks and clamps were applied and then the nails were removed before the flox dried.
Excess flox was removed with paper towels.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.