KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  8-1-2010
Number of Hours:  3.00
Manual Reference:  Chapter 4
Brief Description:  Shape F22 bulkhead foam

The foam piece leftover after the F22 doubler was cut out and a new LAST-A-FOAM 2 x 12 x 48 piece were clamped together. The right half of the F22 bulkhead was traced, then it was flipped over and the left half was traced. Using a coping saw, utility knife and straight edge the 4 pieces were then cutout as shown in the 3rd image below.

The edges were sanded.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.