KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  12-29-2019
Number of Hours:  4.90
Manual Reference:  
Brief Description:  Cowling & flaperon

12/26/19
1.0 Hour
Attached left OB flaperon with drilled AN3-6 bolts. Have to wait for more plus castle nuts.

12/27/19
Received exhaust shields from ASS and camlocs from Pegasus.

12/28/19
2.0 Hours
Used Paul's dimpler to dimple nine of eleven cowlng receptales.A3 rivet holes. Riveted top three receptales into place. Put cowling on. Tried different camloc studs in top three to get correct length. Trial fit exhaust shields on left #2 exhaust pipe to shield radiator hose.

12/29/19
1.9 Hours
Norma counter sunk the camloc reeceptals. Drilled #40 rivet holes and dimpled for two more receptals Attached exhaust shields to #1 and #2 exhaust pipes. Riveted three more receptales.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.