KitLog pro

Powered By Kitlog Pro v2.0

Justin Shumaker's Kitlog
' style=
Date:  2-28-2014
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Header Tanks - Third Time is a Charm

The 1/16" aluminum on the new design was too flimsy. I opted to scrap the design and go with 1/8" aluminum for the vertical support while the brackets remained 1/16". The angle aluminum keeps the tank from moving vertically while the hose clamps (not shown) keep the tank firmly strapped to the vertical support. I still need to drill the holes for the bulkhead fittings and vents, another 2-3 hours of work. The nut plates were installed on the root rib for both wings. Now the wing tanks are 100% done. The focus now shifts to getting all of the plumbing done, lots of AN hose and fittings between the various fuel pumps, solenoids and engine. The fuel lines will easily take a full weekend to integrate and secure to the frame.
' style=

Side View of Header Tank Mount

Side View of Header Tank Mount

' style=

Both Tanks in their Final Location

Both Tanks in their Final Location

' style=

Wing Tanks 100% done

Wing Tanks 100% done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.