KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Jackie's RV-8 Project
' style=
Date:  2-8-2009
Number of Hours:  1.50
Manual Reference:  n/a
Brief Description:  Fuselage bits & pieces

Well, not needed at the parachute club today and after some morning gardening work I decided to brave the heat in the workshop and see if I could do any small bits and pieces. I'm currently waiting for the canopy retaining blocks to be machined to shape for me, so canopy work is on hold. I didn't get a whole lot done but we did get a couple of minors items ticked off.

Summarizing:-

  • Trimmed the front of the bottom canopy frame rails where they were impacting the forward top skin

  • Trimmed the forward top skin each side where it was touching the front canopy hoop and being bent outward.

  • Made up a wooden floor for the space immediately behind the center section so I could work a little more comfortably.

  • Installed the nutplates for the aileron boots (that's the job that required Jackie's help).

  • Installed nutplates on the right-side fuselage bulkheads between the front and rear seats where I am putting a cover plate.

  • Made up a bracket for the 12VDC outlet and fitted to the cross-brace underneath the instrument panel on the right side (pictured).


Like I said, not a huge amount of work, but certainly got a few things out of the way. Those aileronn boot nutplates have been waiting for probably 9 months to a year or even more!
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.