KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  2-16-2014
Number of Hours:  2.00
Manual Reference:  Sect. 7
Brief Description:  Tank Prep (Cont'd)

Installed, sealed and riveted the tank drain valve. Relatively easy operation. Made a mess with the pro-seal, but found that it cleans up well using the Acetone. Also went back and sealed the flop-tube support bracket.
' style=

Drain Valvel

Drain Valvel

' style=

Drain Valve

Drain Valve

' style=

Flop Tube Support Bracket

Flop Tube Support Bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.