KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  1-11-2014
Number of Hours:  4.00
Manual Reference:  Sect. 7
Brief Description:  Misc. Tank Prep

Spent about four hours total completing various tank features required before closing this thing up. First I removed all the blue-plastic on top/bottom along the rivet lines. Second I scrubbed with a red Scotch-Brite pad the areas to be pro-sealed. And last, of course also the most time-consuming...I fabricated the vent-line bracket for the right tank. This turned out to be a royal PIA because the metal is just a little too thick to bend with your fingers. I tried various methods, but finally in the end I just used a pair of thin needle-nose pliers and incrementally bent the metal. I realize I'll have to open this up again before riveting and also when it comes time to actually install the vent line into the bracket. Hopefully that will go okay.

Next step is to dimple the skins! Progress. ;-))
' style=

Rivet Lines Exposed

Rivet Lines Exposed

' style=

Scrubbed Pro-Seal Locatons

Scrubbed Pro-Seal Locatons

' style=

Fabricated Vent-Line Bracket

Fabricated Vent-Line Bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.