Powered By Kitlog Pro v2.0
Baby Steps to an RV-8
RV-8
Fuel Tanks
11-9-2013
< Previous Log Entry
Next Log Entry >
Date:
11-9-2013
Number of Hours:
2.00
Manual Reference:
Sect. 7
Brief Description:
Documenting about two hours of work on Saturday:
- Drilled right tank baffle plate. Had to remount the Z-Brackets
- Painted/primed the Z Brackets
- Removed tank skin to drill Left Tank Z-Brackets and Baffle Plate
Good day overall. Felt like I was getting some things done finally.
Drilling Z-Brackets
Priming Z-Brackets
Removed skin to drill
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
241
477
Empennage
105
201
Fuel Tanks
66
120
Fuselage
2
4
Hangar
6
12
Wings
62
140
Copyright © 2001-2024 Matronics. All Rights Reserved.