KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  11-3-2013
Number of Hours:  2.00
Manual Reference:  Sect. 7
Brief Description:  Left Tank Mounting and Drilling

Only two hours logged, although I was at the airport for almost five. Spent an hour or two flying the Cherokee. Did a touch and go at Lorrain County with Joe. Then spent some time in the office.

Finally getting to work, I was able to drill and cleco the Left Tank outboard and inboard z-brackets. Removed the Leading Edge and the Fuel Tank Skin so that I can get to the remaining brackets tomorrow.

Also drilled out the Transition Plate on the Fuel Tank side with a #19 drill. I need to prime the plate and dimple the holes if I remember correctly.
' style=

Leading Edge Removed

Leading Edge Removed

' style=

Tank Skin Removed for Z-Bracket Drilling

Tank Skin Removed for Z-Bracket Drilling

' style=

Transition plate driled

Transition plate driled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.