KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  9-13-2013
Number of Hours:  2.00
Manual Reference:  Sect 7
Brief Description:  Installation of Fuel lTank (cont'd)

Continuing on with the Checkoway method. Tightened up the tank/leading edge joint with straps. Drilled the inboard z-bracket using the angle drill. Could not find my 12" drill unfortunately. Need to remove the leading edge assembly to drill outboard next, but that's going to require a mod to my wing-stand. Will tackle that on Friday.
' style=

Inboard drilled out.

Inboard drilled out.

' style=

Getting things tightened up and drilled.

Getting things tightened up and drilled.

' style=

Drilling.

Drilling.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.