KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  9-18-2009
Number of Hours:  2.00
Manual Reference:  Sect. 6
Brief Description:  Horizontal Stabalizer-Port Drilling

Very good night. Started with trying to figure out where I left off two weeks ago. Completed drilling of the underside, then flipped the project and drilled & cleco'd top half. Disassembled to complete final drilling of HS-810 and HS-814. Started starboard side by clecoing the ribs to the spar. Finished there for the evening. In the meantime, Katie made progress on the paint booth, forming the door and installing the shelf. Jeremy assisted both of us, and managed to change the oil in both his Honda and Katie's Jeep. Altogether it was a great evening.
' style=

Finished for the night

Finished for the night

' style=

Drilled and Cleco'd

Drilled and Cleco'd

' style=

Paint Booth in progress

Paint Booth in progress

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.