KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  1-23-2009
Number of Hours:  2.80
Manual Reference:  7-9, 7-10
Brief Description:  Installed right hand fuel tank.

I installed the right hand fuel tank and fastened the screws to the spar and the inboard edge of the leading edge assembly. I started from the top and bottom leading edge and moved aft alternating both sides. I got a pretty nice joint between the tank and leading edge assembly. All my AN3-4A bolts went in no problem (all lined up) and torqued them to 25 in/lbs then applied torque sealant.
' style=

Right tank installed

Right tank installed

' style=

Tank attach bolts torqed and marked

Tank attach bolts torqed and marked

' style=

A nice even gap here

A nice even gap here

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.