KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  2-27-2010
Number of Hours:  7.00
Manual Reference:  8-65, 8-66
Brief Description:  Aft Upper Skins and Bulkheads - Part 1.

It didn't take me 7.0 hours to make these wood floors. This log is combined with several other little items like drilling the holes in the fuselage sides for the SafeAir1 static source holes. I cut a slot (two actually, the first one was at the wrong end!) to accommodate the elevator pushrod bellcrank assembly.
' style=

Hardwood floors are in!

Hardwood floors are in!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.