KitLog pro

Powered By Kitlog Pro v2.0

JORGE'S WEB SITE
' style=
Date:  10-4-2019
Number of Hours:  1.25
Manual Reference:  
Brief Description:  Spar drilling and bracket.

Finished drilling the spar holes to #20. Match drilled the spar bracket to the doubler. Ran #30 reamer through holes for trailing edge.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.