KitLog pro

Powered By Kitlog Pro v2.0

Legacy N222BZ
' style=
Date:  3-22-2004
Number of Hours:  3.00
Manual Reference:  Sec 2A
Brief Description:  Fuselage & wing stub aligned in factory jig.

Once the factory certified fixed jig was available, the stub wing was placed into it, aligned and leveled. When it was secure in the jig, the fuselage was lifted into position over the stub wing and aligned. The joggles were trimmed and sanded IAW the manual. This required lifting the fuselage off several times before a proper fit was achieved. When all trimming was done and the fuselage and stub wing were aligned, cleco holes were drilled all along the leading and trailing edges of the stub wing and into the fuselage.
' style=

Stub wing installed in the factory jig.

Stub wing installed in the factory jig.

' style=

Fuselage aligned to the stub wing.

Fuselage aligned to the stub wing.

' style=

Tail section secured to the jig.

Tail section secured to the jig.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.