KitLog pro

Powered By Kitlog Pro v2.0

Jerrys Web Site
' style=
Date:  9-9-2011
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Rear Spar

Today, I reamed the rear attach brackets for AN-3 bolts, then disaasembled, deburred, scuffed, cleaned and prep'd for proseal and final assembly. Every thing went smooth, except of course proseal is a mess. I went through many sets of disposable latex gloves.

The only issues, the SR plans didn't say, but the Moose plans said to install the AN-3 bolts forward, i.e. elastic nut and washer on inside of fuel tank. I couldn't figure out why, but went ahead and installed them that way. I put the rivets forward as well, except for the top row, which had to be pulled from behind.

I completed the attach brackets and doublers for both rear spars.
' style=

Reaming Rear Attach Brackets

Reaming Rear Attach Brackets

' style=

Proseal, Rivets, and bolts complete

Proseal, Rivets, and bolts complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.