|
|
Jerrys Web Site
|
Date: 9-9-2011
|
Number of Hours: 4.50
|
Manual Reference:
|
Brief Description: Rear Spar
|
|
Today, I reamed the rear attach brackets for AN-3 bolts, then disaasembled, deburred, scuffed, cleaned and prep'd for proseal and final assembly. Every thing went smooth, except of course proseal is a mess. I went through many sets of disposable latex gloves.
The only issues, the SR plans didn't say, but the Moose plans said to install the AN-3 bolts forward, i.e. elastic nut and washer on inside of fuel tank. I couldn't figure out why, but went ahead and installed them that way. I put the rivets forward as well, except for the top row, which had to be pulled from behind.
I completed the attach brackets and doublers for both rear spars.
|
|
Reaming Rear Attach Brackets
|
|
Proseal, Rivets, and bolts complete
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |